Prevost Construction has completed 19 new hub site locations throughout San Diego for Time Warner Cable. Each hub site consisted of 2 hour wall construction with integrated HVAC systems and emergency generators. All of the hub sites are linked to the Head End facility at Ware Court, which was constructed in 1995. The $2.2 million project included structural upgrades to withstand earthquakes of up to 8.5 in magnitude. The 12,000 SF build out also featured a demo center, large computer rooms, emergency generators, and the room shown below called "Mission Control."



Contract Amount to Date: $4.0 Million
Project Size: N/A
Type: Hub Sites & Head End Facility
Contact: Jim Allen, 858-755-7800




"Your personal commitment to our very tight time frame was a key ingredient to the projects success...Thank the entire Prevost team for a job well done."

Jim Allen
Construction Consultant




Select a project below to view more information and photos.
  • Texas Instruments
  • Jade Theater
  • Bekaert
  • ViaSat
  • San Diego Golf Academy
  • Time Warner
  • Alaris Medical
  • Guidant


  • High Tech/Specialty Overview
  • Completed Projects Overview
  • © 2011 ALL RIGHTS RESERVED. PREVOST CONSTRUCTION, INC. Back to Top